Rio Tinto world-first autonomous trains network now fully operational
Rio Tinto has successfully deployed AutoHaul, establishing the world’s largest robot and first automated heavy-haul, long distance rail network.
Since completing the first loaded run in July, Rio Tinto has steadily increased the number of autonomous journeys across its world-class iron ore operations in Western Australia in a controlled and safe manner, with over 1 million km now travelled autonomously. The driverless train program is now fully operational ten years after it was first proposed.
Rio Tinto’s Ivan Vella, Iron Ore managing director of Rail, Port & Core Services, commented “The safe and successful deployment of AutoHaul across our network is a strong reflection of the pioneering spirit inside Rio Tinto. It’s been a challenging journey to automate a rail network of this size and scale in a remote location like the Pilbara, but early results indicate significant potential to improve productivity, providing increased system flexibility and reducing bottlenecks.
“Over the coming months we will continue to refine our autonomous operations to ensure we are able to maximise value. We continue to work closely with drivers during this period and do not expect to make any redundancies in 2019 as a result of the deployment of AutoHaul.”
Related stories:
Rio Tinto and China Baowu negotiating extension of Pilbara iron ore JV
Rio Tinto approves $2.6bn investment into Koodaideri Mine of The Future
Rio Tinto autonomous shipments cross 1 billion tonnes
Rio Tinto completes first autonomous train shipment for AutoRail programme
The $940m AutoHaul programme is focused on automating trains transporting iron ore to Rio Tinto’s port facilities in the Pilbara region of Western Australia. The network is the world’s first heavy-haul, long distance autonomous rail operation. Rio Tinto operates about 200 locomotives on more than 1,700km of track in the Pilbara, transporting ore from 16 mines to four port terminals.
The average return distance of these trains is about 800km with the average journey cycle, including loading and dumping, taking about 40 hours. Locomotives carrying AutoHaul software are fitted with on-board cameras allowing for constant monitoring from the Operations Centre. All public rail crossings on the network are fitted with CCTV cameras and have been upgraded to the highest safety standards.
- Rio Tinto to Acquire Arcadium Lithium for $6.7bnSupply Chain & Operations
- Rio Tinto, BHP & Glencore 'Feeling the Pinch on Copper'Supply Chain & Operations
- Rio Tinto Brings Simandou Guinea Iron Ore Saga to EndOperations
- Rio Tinto and China Baowu collaborate for low-carbon shiftSupply Chain & Operations